PowerStation no 1 A-B 42.5 Mw
42.5 MW Gas Turbine

The gas turbine unit operates according to a comparatively simple cycle.

Compression in (2) two steps with inter-cooling, combustion in (2) combusting chambers and expansion in three (3) steps.

The air first reaches the low pressure compressor and finally to the two combustion chambers. In the combustion chamber the fuel is supplied and gas with a temperature of 700ْ C is formed. This gas is used to operate the turbine-driven compressors and then the turbine, witch via the coupling operates the generator.

This plant is a light oil fuel-fired gas turbine power plant. The plant are also able to operate on natural gas or “washed” heavy fuel oil. The power plant is complete and not in operation but professionally preserved to retrain the status of the equipment. The turbine, pumps and fans have been rotated once a month since the plant was put in stand-by mode as a part of the Swedish electricity capacity reserve. Se data below and description in Enclosure 2. The Buyer have to make all civil works.

 

Technical Data:

Manufacturer:

ABB STAL-LAVAL

 

Turbine

ABB STAL-LAVAL, TYPE GT 120, Gas turbine.

 

Manufactured:

1962

 

Design data: 

42.5 MWe.  11kV

 

Type GT 120:  

LT   r/m 3 250

 

 

HT  r/m  3 700

 

 

KT  r/m  3000

 

Order no:

9230.20

 

Capacity:

42 500 kW (at 760 mm Hg, -5ْ C outdoor temp, +10C cooling water temp.)
35 000 kW ( at 740 mm Hg, +15ْ C outdoor temp, +10 cooling water temp.)

 

Spec. heat

3 175 kCal/kWh at full load which means total

 

Consumption

efficincy 27 %

 

Number of start-ups:

435 times for generation ad 425 for power correction

 

Hours of operation:

6 410 hours of active power generation and 26
438 hours for reactive power generation.

 

Fuel:

Light fuel oil, natural gas or treated “washed”
Heavy fuel oil.

 

 

 

 

Generator:

 

 

 

 

 

3 – 50Hz

 

 

 

Type GTA 1629

 

No 494 1049

 

 

 

Magn, 400V

 

11 000V

 

 

Connection Y

 

 

3000 r/m

 

 

 

 

 

2 bars (g) 

 

0,035 bars (g)

 

55 000 KVA x 0,8

 

50 000 KVA x 0,8

 

11 000  V

 

11 000 V

 

2 890 A

 

2 625 A

 

Magn 380 A

 

Magn 380 A

 

 

 

 

0 bars  (g)

 

 

44 000 KVA x 0,8

 

 

11 000 V

 

 

2 310 A

 

 

Magn 380 A

 

 

 

 

 

Temperature 

 

 

Classification:

Rotor

 

B Stator B Norm

 

 

SEN22

 

 

Manufactured

1962

 

 

 

 

The  plant also include:

Lubrication system, hydrogen and carbonic acid system, fuel system, ignition system, cooling water system:
Automatic oil control system and operating oil system, jointing oil system, control air syatem, cleaning system, automatic control system, automatic and hot water system.

NOTE:  The gas turbine, taken into operation 1962, is designed for production with heavy as well as light fuel oil.

From 1983 only light fuel oil have been used.

Miscellaneous:

Total number of gas turbine starts 435,  Total number of starts for power correcting 425, Total operating time – active 6 410, Total operating time – reactive 36 438, Accelaration time for gas turbine operation (warm unith) 3 minutes, Accelaration time for power correction operation (cold unith) 6 minutes, Full load 42MW 12 minutes. Operating Crew permanent 2-3- persons.

 
     
 
 